- testing the replacement for grid segmenting for most parts of the maps project, which is to scale 0.3 or 0.4 metre imagery to 0.15/0.2 metre size and use doubled dimension tiles in Qgis.
- writing a script to create and copy the sidecar files for the doubled dimension jpeg tiles automatically to save on a lot of manual steps especially with multiple generations of historical images that all need these files duplicated and having to change the pixel size in the world files to match the larger mosaic layer sizes.
- converting the Dunedin-Burnside part of the Dunedin-Mosgiel mosaic tiles Gimp project from a sectioned canvas format to a linear canvas format.
As well as the southern part of Dunedin going out as far as we can with the 0.125 metre resolution urban imagery until we have to switch to the 0.3 metre or 0.4 metre stuff that covers probably the rest of the way to Invercargill except for probably a small number of townships that will have something of higher resolution, we also have to go north to the limits of the Dunedin coverage in that direction so we are working to get that sorted today.
Last week we also downloaded 0.075 metre coverage of Timaru City and will have a look to see what is available going further south. Retrolens coverage downloaded is currently down to Pareora, and rural base imagery down to Tumai. Finishing all the downloads for the MSL corridor and retrieving the 100 GB or so of disk space used remains a high priority so that is one reason why the work seems slow at the moment.
Hillside Workshops as seen in 1972. As mentioned above a rough overlap can be seen between two layers vertically in the left hand third of the image, this has been correct in current aerial mosaics.
The same Hillside site seen in 2013, which is the latest aerial imagery of Dunedin at high resolution. Now a bit out of date with further changes at Hillside Shops since it closed a few years ago.