New Zealand Rail Maps Project
-
Wairarapa Line [0Q]: Volume 6 Progress Update 17
Click here to view this article on NZ Rail Maps Blog Wairarapa Line [0Q]: Volume 6 Progress Update 17
-
Wairarapa Line [0Q]: Volume 6 Progress Update 17
Welcome to Volume 6 Progress Update 17. Work on the maps is now well underway on the section of the Wairarapa Line from Waterloo to Upper Hutt and hopefully all the way to Masterton by the end of this week in order to have a reasonable prospect of keeping to the schedule and having the…
-
Wairarapa Line [0P]: Volume 6 Progress Update 16
Click here to view this article on NZ Rail Maps Blog Wairarapa Line [0P]: Volume 6 Progress Update 16
-
Wairarapa Line [0P]: Volume 6 Progress Update 16
Since our last update we have completed drawing maps of the entire Gracefield Branch and Hutt Workshops sidings. In the process of this we added additional generations of historical aerial mosaics both for the Workshops and for Gracefield, which added about a day. These mean that for Hutt Park (the workshops) we have 1939, 1969,…
-
Wairarapa Line [0O]: Volume 6 Progress Update 15
Click here to view this article on NZ Rail Maps Blog Wairarapa Line [0O]: Volume 6 Progress Update 15
-
Wairarapa Line [0O]: Volume 6 Progress Update 15
Today we can report that we have made further progress having now got onto the Gracefield Branch after completing initial mapping of the Melling Branch and the main line to Woburn, including Petone, Lower Hutt, Melling, Ava and Woburn stations. After the initial maps we remembered to look up the Valley Signals website and discovered…
-
Wairarapa Line [0N]: Volume 6 Progress Update 14
Click here to view this article on NZ Rail Maps Blog Wairarapa Line [0N]: Volume 6 Progress Update 14
-
Wairarapa Line [0N]: Volume 6 Progress Update 14
Work has proceeded on he Volume 6 maps more slowly this week than in most previous weeks and although major yards like Petone aren’t too common in the Wellington suburban area, with the work on other segments further up the corridor, we are now estimating about another two weeks to complete this volume so it…
-
Wairarapa Line [0M]: Volume 6 Progress Update 13
Click here to view this article on NZ Rail Maps Blog Wairarapa Line [0M]: Volume 6 Progress Update 13
-
Wairarapa Line [0M]: Volume 6 Progress Update 13
Since our last report, progress has slowed somewhat due to other commitments, and it doesn’t look very likely we will be able to keep this volume completely on track with an expected completion deadline of 10 March. This is simply due to the amount of work needed to cover in particular Wellington, and the yard…