NZRM Progress Report 2024-02-24: Volume 1, Volume 4, Volume 5, Volume 6, Volume 9, Volume 10, Volume 11
This month’s work on New Zealand Rail Maps has covered a range of different areas. Work completed includes the following: Nothing to say about webmaps this time.
-
NZRM Progress Report 2023-11-25: Volume 6
Work on maps recently has been focused on Volume 6. In the 1960s the NIMT between Porirua and Plimmerton was doubled, electrified and realigned. Whilst mapping has been done on this section before, it needed to be redone to make it easier to overlap the mosaics produced from Wellington to Porirua which are in a…
-
NZRM Progress Report 2023-11-06: Volume 1, Volume 2, Volume 3, Volume 6
Work on maps recently has been undertaken in the area of Taneatua, which is part of Volume 3. Aerials of Taneatua Station obtained some time ago were used to create a comprehensive set of maps from the old Taneatua overbridge as far as the station yard. This also included the Peketahi combined bridge in part,…
-
NZRM Progress Report 2023-10-17A: Proposed Work Schedule To End of 2024
After consideration the work schedule for the maps project from date to the end of next year is proposed as follows. The plan is to complete up to four volumes which are already well in hand and therefore only need a relatively small amount of work to complete. So all of these are in the…
-
NZRM Volumes: Volume 6 (Wellington-Palmerston North-Wairarapa Railways)
Volume 6 of New Zealand Rail Maps covers the following sections of line: Wairarapa Line Main Line Corridor Both the North Island Main Trunk and the Wairarapa Line start at the platforms at Wellington Railway Station. This is an interesting historical ambiguity from 1937 in that the lines before that started at the individual stations…